Help | Disclaimer | Sitemap | Search | Jobs
WEISS ELECTRONIC

WEISS ELECTRONIC



Home Company Projects Systems Products Services Download Contact



SWIS Thuringia 
TFT Berlin 
Autostrade Italy 
Motorway A4 Stadtroda 
Motorway A31 Emstunnel 
Video monitoring Dharan 
TTS Berlin 
Tunnel René Konen 
A2 Gotthard Tunnel 
Motorway A1 Bremen 
Traffic Data Duesseldorf 
A7 Traffic situation Elbtunnel 
Traffic Data Hesse 
Ramp Metering NRW 
A70 Tunnel Schwarzer Berg 
Motorway A4 Dresden 
A99 Munich Motorway Ring 
Motorway A3 Wuerzburg 
A10 Berlin Motorway Ring 
A3 Cologne Motorway Ring 


Tunnel René Konen - City of Luxemburg
Renewal of the complete traffic management system

Home > Projects > Tunnel René Konen

Project Conception

The Tunnel René Konen in Luxemburg-City has a length of 666 m and runs underneath the city centre. The tunnel traffic flows in one direction, without any parking lanes.

The renewal was necessary as the existing system had been destroyed by a smouldering fire.

In cooperation with a parnter from Luxembourg, Enco-tec S.A., Weiss-Electronic refits the complete traffic management system, using the most modern tunnel technology.

Besides the new implementation of the traffic control system, the permanent signs are substituted
by LED signal heads for lane signalisation and loops are installed for traffic data acquisition. The traffic control system with tunnel sub-center unit operates in automatic mode, but manual control is possible via four outsourced operating stations. Four display cross-section with variable traffic signs in LED-technology on the tunnel walls manage th traffic, displaying speed limits and ban on passing. Five more display cross-sections allocate the lanes via permanent lights mounted at the tunnel ceiling.

The light-signal-system, barriers and signal heads at the tunnel entrance allow the closure of the tunnel (e.g. when the height-control was activated).

In front of the tunnel, four prism openers are installed for traffic control resp. for traffic diversions when the tunnel is closed.

Installation Characteristics/ Project Content
  • 8 variable traffic signs in LED-technology
  • 10 permanent light signals
  • 2 entrance signal heads
  • 1 barrier system
  • 10 double loops
  • 4 prism openers
  • 3 road stations
  • 1 tunnel sub-center unit
  • 4 operating stations


Detail view
Realisation

Start of constructions: September 2004.
Begin of operation: starting June 2005.
The project volume for the Weiss-Electronic-part amounts to approx. € 240 thousands.


© 2001 WEISS-ELECTRONIC GmbH - Niederkircher Straße 16 - 54294 Trier - Germany
Company | Projects | Systems | Products | Services | Download | Contact