| Help | Disclaimer | Sitemap | Search | Jobs |
![]() |
|
|
|
|
|
|
|
Ramp Metering System in North Rhine-Westphalia Home > Projects > Ramp Metering System NRW Project Conception The signal light installation of the ramp metering system is switched off as long as the traffic flows unhindered on the main road. Measurement loops monitor the traffic flow. As soon as the traffic density reaches a threshold value, ramp metering and signal light installation are activated. Algorithms calculate from the current traffic data the optimal parameters for the signal head control. The time for the "red phases" for the oncoming traffic is regulated according to traffic density. In order to avoid greater gisturbances on the main lane of the motorway, only one vehicle at a time is allowed to pass the ramp metering installation during the green phase. This is realised by a fast reaction upon loop impulse and by short yellow phases.
|
|
|
© 2001 WEISS-ELECTRONIC GmbH - Niederkircher Straße 16 - 54294 Trier - Germany Company | Projects | Systems | Products | Services | Download | Contact |