Help | Disclaimer | Sitemap | Search | Jobs
WEISS ELECTRONIC

WEISS ELECTRONIC



Home Company Projects Systems Products Services Download Contact



SWIS Thuringia 
TFT Berlin 
Autostrade Italy 
Motorway A4 Stadtroda 
Motorway A31 Emstunnel 
Video monitoring Dharan 
TTS Berlin 
Tunnel René Konen 
A2 Gotthard Tunnel 
Motorway A1 Bremen 
Traffic Data Duesseldorf 
A7 Traffic situation Elbtunnel 
Traffic Data Hesse 
Ramp Metering NRW 
A70 Tunnel Schwarzer Berg 
Motorway A4 Dresden 
A99 Munich Motorway Ring 
Motorway A3 Wuerzburg 
A10 Berlin Motorway Ring 
A3 Cologne Motorway Ring 


Traffic Control Installation
Motorway A1 Bremen

Home > Projects > A1 Bremen

Project Conception

The high volume of traffic, especially during the main travel seasons, requires the implementation of this traffic control installation, which was commisioned by the Office for Road and Bridge construction (Amt für Straßen- und Brückenbau). Particularily affected is the motorway A1 in the Bremen area (State of Lower Saxony), from the junction Posthausen to the junction Delmenhors-East.

For the current Traffic Situation of the Traffic Control Installation A1 Bremen/Lower Saxony
click here.


Project Content
  • Sub-center (UZ2000)
  • 43 Road stations
  • 84 Detection cross-sections with 79 radar detectors and 68 detectors for induction loops
  • 29 Display cross-sections with gantries and
    129 variable traffic signs (type A and B/C)
  • Environmental data
    5 weather-stations with black-ice detectors and range-of-vision detectors
Project Extension

The project was extended from 2003 to 2005.
During the realisation phase, the existing traffic control installation was under operation, only partly interrupted
for short periods of time.


Project Content Extension
  • Sub-center (UZ2000) software update
  • 17 Road stations
  • 58 Detection cross-section with 32 radar detectors and 53 detectors for inductive loops
  • 2 Mobile stations for traffic data acquisition with video mit Video
  • 32 Display cross-sections with gantries and
    113 variable traffic signs (type A, B/C, C1)
  • Environmental data
    4 weather-stations with black-ice detectors and
    range-of-vision detectors

Detail view
Realisation

As general cotractor, Weiss-Electronic GmbH has the complete responsibility for this project. The implementation took eight months, project terminatin was 1997. The costs of this extensive project amunted to approx. € 4.5 millions.

The extension was implemented jointly with partners for civil enineering and gantries. The total for the Weiss-part amounted to approx. € 2.3 millions. The commision's total amounted to € 6 millions.